Skip to content

Halton Region

Halton Region Basement Flooding Prevention Subsidy

Halton Region pays up to 100% of eligible costs to disconnect weeping tiles, exterior storm drains and downspouts from the sewer, and 50% of backwater valve and sewer lateral work. We complete the work in Oakville, Burlington and Milton and prepare the documents you need.

  • Free written estimates
  • Permits and rebates handled
  • 24/7 emergency service
Illustrative photo of an excavated foundation with drainage membrane and new weeping tile

How the program works

What the Halton flooding subsidy covers

Halton Region's subsidy program focuses on keeping stormwater out of the wastewater system. For work completed after July 15, 2024, the Region pays up to 100% of eligible disconnection costs, and it increased several limits in 2025.

We disconnect weeping tiles and install sump pumps, disconnect downspouts and storm drains, install backwater valves and repair sewer laterals across Oakville, Burlington and Milton. Every job comes with the invoice, photos and footage the Region asks for.

Halton Region Basement Flooding Prevention Subsidy Program amounts
Eligible workShare paidMaximum
Weeping tile disconnection with sump pump100%$6,500
Exterior storm drain disconnectionReverse-slope driveway, stairwell and patio drains.100%$6,500
Downspout disconnection100%$900
Backwater valve (inside the home)50%$1,600
Sewer lateral lining or repair50%$4,000

Who qualifies

  • Homes in Halton connected to the Region's wastewater system (septic homes are not eligible)
  • Proof of an existing stormwater connection, from a Household Drainage Survey or a licensed plumber's assessment
  • Building permit and passed final inspection from Burlington, Milton, Oakville or Halton Hills where required
  • Disconnection subsidies are available once per property

Documents you need

  • Signed application and waiver forms
  • Itemized invoice paid in full, listing materials, labour, CCTV and permit costs
  • Before and after photos, CCTV footage or dye test results

Timing: Apply within 1 year of completing the work.

Rebate calculator

Estimate your Halton flooding subsidy

Choose the work you are planning. Add your quote amounts for an exact figure, or leave them blank to see the maximum.

Program: Halton Region Basement Flooding Prevention Subsidy Program

Choose the work you are planning

Halton: previous and current limits

View the data table
ItemPrevious maximumCurrent maximum
Weeping tile disconnection with sump pump$5,000$6,500
Downspout disconnection$500$900
Backwater valve (inside the home)$675$1,600
Sewer lateral lining or repair$2,000$4,000

Source: Halton Region. Verified September 25, 2026.

Halton: share of the eligible invoice the Region pays

View the data table
ItemShare covered
Weeping tile disconnection with sump pump100%
Exterior storm drain disconnection100%
Downspout disconnection100%
Backwater valve (inside the home)50%
Sewer lateral lining or repair50%

Source: Halton Region. Verified September 25, 2026.

Burlington homeowners: Burlington covers the building permit fee for sanitary line repair or replacement that includes a backwater valve. City of Burlington Home Flood Protection Program.

How we help

How we prepare your Halton flooding subsidy application

  1. Step 1

    Proof of the connection

    The Region needs proof of an existing stormwater connection. A licensed plumber's assessment qualifies, and its cost can be claimed within the program limits.

  2. Step 2

    Permit and inspection

    We get the building permit and final inspection from Burlington, Milton or Oakville where required.

  3. Step 3

    Before and after evidence

    We record photos, CCTV footage or dye test results before and after the work.

  4. Step 4

    Complete paperwork

    Your paid, itemized invoice lists materials, labour, CCTV and permit costs, ready for the application.

FAQ

Halton flooding subsidy questions

Straight answers to the questions homeowners ask us most. If yours is not here, give us a call.

How much does the Halton basement flooding subsidy pay?

For work completed after July 15, 2024, the Region pays 100% up to $6,500 for weeping tile disconnection with a sump pump, 100% up to $6,500 for exterior storm drain disconnection, 100% up to $900 for downspout disconnection, 50% up to $1,600 for a backwater valve and 50% up to $4,000 for sewer lateral lining or repair.

How long do I have to apply?

You must apply within one year of completing the work. Disconnection subsidies are available once per property.

Is a water-powered backup sump pump eligible?

No. Halton Region does not accept water-powered backup sump pumps for the subsidy. We install battery backup systems.

Does the Region recommend contractors?

No. The Region does not choose contractors. You hire a licensed contractor, and the Region pays the subsidy to you once your application is approved.

How is the subsidy paid?

The Region mails a cheque, generally four to six weeks after it receives a complete application.

Let us work out your rebate

Book a free estimate. We will confirm you qualify, quote the work and show your rebate and your cost after it, in writing.